Xinxiang Great Wall Machinery Co.,Ltd
|
Price: | 100000.0 USD |
Place of Origin: | Henan, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
CHAENG (Great Wall Machinery) can undertake 20 tons --1.5 million tons of Manganese slag powder plant EPC projects.We can provide raw material testing , engineering design,equipment manufacturing,installation,debugging,technical training,standard production,production contract and "turnkey" service.
CHAENG adhering to the "three heart" service aims to provide customers with pre-sale, sale, after-sale and one-stop total service solution!
Process Description
Forklift will transfer the Manganese slag from the slag pile to the weighting silo.
during the transportation, the Manganese slag will be magnetized and sieved to remove the iron parts. The pre-processed slag then will be fed to the vertical mill by the elevator for grinding.
After grinding, the Manganese slag will be classified and dried by the hot air generator.
The required Manganese slag powder then will be collected by the dust collector and transferred to the final product ware house by air delivery chute and elevator.